The design, engineering, fabrication, delivery and installation of a series of Essential worker accommodation units (2 bedroom) for a private client of GTT’s.
Challenge:
Required to be design for BAL_29 given the end location of the buildings, as well as requiring a disassembly capability as these units were to be relocated in years to come.
Solution:
GTT’s Full Kit of Parts system provided a beautiful design, suitable for BAL_29 by utilising hardwood cladding and featuring disassemblable fixings to flat pack the building back down again int he future.
Outcome:
A finished, 2-bedroom home. Manufactured in 4 days and installed in 2 days at a highly affordable price point.